Projects

Review of Feasibility Study and Drafting of the Detailed Engineering Project “Construction of LLogara Tunnel”

Period : 10/2020 – 04/2021

Consultancy services for development of Preliminary Design with elements of Detailed Design for the works contract for Tunnel Prenj and tender documents for Tendering according to the Design & Build Model

Period : 01/2023 – 10/2023

“Study and Design for the Widening of Tirane-Durres Motorway"

Period : 08/2015 -08/2017

Preparation of Feasibility Study and Detailed Design for the motorway connecting Thumanë – Vorë – Kashar

Period : 02/2015 – 06/2017

Planning and Preparation of the Result-Based Road Maintenance and Safety Project (RRMSP - Financed by World Bank

Period : 11/2014 – 11/2015

Feasibility and Project Development Study for the Tirana BRT system

Period : 10/2020 –07/2022

Requalification of the Coastline Vlore – Radhime - Orikum" (Ongoing)

Period : 09/2022 – ongoing

Study and Detailed Design for the Auto-Moto Park with test track and sports racing events, an area dedicated for motorcycle activities, space for the control of ability to circulate and homologation of road vehicles and the Museum "Albanian Road Transport Automotive Vehicle History” (Ongoing)

Period : 01/2024 – ongoing

Feasibility Study For The Road Concession Scheme For a New Motorway 33 Km Kashar –Rrogozhine (Harizaj)

Period : 08/2017 – 12/2017

Feasibility Study for the Albanian southern airport

Period : 11/2017 – 03/2018

Feasibility Study for Reconstruction of Quays 1 & 2 in the Durres Port

Period : 06/2018 – 09/2019

Detailed design for the link road between "Bune Bridge - Shkodër Velipojë National Road and the Building of the Border Crossing Point "Bune Bridge" including its auxiliary infrastructure

Period : 07/2023 – 12/2023

Technical Studies, Detail Design and Environmental and Social Studies Completion for the Waste Management Investment Program “EU For Circular Economy” In Albania, LOT 1 - Kukes

Period : 01/2024 – ongoing

Design of the new bridge at Fierza Hydropower Plant

Period :12/2021 – 12/2022

Durres Waterfront Development

Period : 01/2021- 11/2023

Touristic Resort Green Coast 3 in Palasa, Vlora

Period : 12/2022 – 12/2023

Rolling Hills by the Lake

Period :06/2021- on going

Independent Checking Engineer for Design drawings for the Project: Construction of Vlora Bypass" (Financed by EU, EBRD, EIB.)

Period : 01/2016 – 06/2017

Detailed Design for protection measures of right slope between the intake system and dam crest of HEC Koman

Period : 11/2017 – 03/2018

Preparation of Detailed Design and BoQ for the protection of equilibrium towers from rock fall and slide phenomena. Protection and stabilization from the sliding of colluviums at HEC Koman

Period :02/2019 – 05/2019

Bathymetry of Koman and Vau i Dejes lakes, assessment of sediments and geological assessment of mountain slopes

Period : 07/2023- 11/2023

Construction Supervision Services-FIDIC Engineer for Phases I and II for the construction of Beljakovce – Kriva Palanka section, part of Railway Corridor VIII