Design of the new bridge at Fierza Hydropower Plant

Client

KESH - Albanian Power Corporation (APC)

Period

12/2021 – 12/2022

Description

Our scope of work include preparation of the preliminary and detailed design of the new bridge which will connect Fierza hydropower with the national road axis Fushe Arrez-Bajram Curri and demolition of the existing old bridge. This new bridge will be about 120 m length.