“Review of Feasibility Study and Drafting of the Detailed Engineering Project “Construction of LLogara Tunnel”

Client

Ministry of Infrastructure and Energy

Period

10/2020 – 04/2021

Description

This Project is being prepared in partnership with “iC Consulenten Ziviltechniker GesmbH”, “ELEA iC d.o.o” “IBE d.d.” and “InfraKonsult” Sh.p.k. The project aims first and foremost to address the SH8 road traffic safety issue in the ridge section. It will also aim at promoting local tourism development, improving port clusters construction, and upgrading distribution system. The project consist on the design of the approx. 7.4 km road- category C2, approx., 6 km tunnel and 2 bridges. The service include:

  • Conduction of all the measurements and investigations necessary to collect accurate information for the drafting of “Construction of Llogara Tunnel” project.
  • Conducting an environmental impact study
  • The Review of the Feasibility Study
  • Preparation of the project-idea, the detailed technical project and the construction of the bridges and structures;
  • Construction works value 155 mln €