Detailed Design for protection measures of right slope between the intake system and dam crest of HEC Koman

Client

KESH - Albanian Power Corporation (APC)

Period

11/2017 – 03/2018

Description

This Project has been prepared in partnership with the company Atelier 4 Shpk. The Project consists in the identification of the measurements to ensure the protection of the right shoulder between the intake system and the crest of the HEC Koman Dam. This project provides technical solutions to avert damage that could occur to the concrete screen of the dam, the intake gallery and the take-off facility, from the possible fall of the rocky mass on the upper side of the dam. This investment will eliminate as much as possible danger to the dam screen, the intake facility area and the access to tunnel no. 4 of discharge, from the rock fall on the upper side of the dam.

Construction works value: 4.4 million €