Detailed design for the link road between "Bune Bridge - Shkodër Velipojë National Road and the Building of the Border Crossing Point "Bune Bridge" including its auxiliary infrastructure
Client
Albanian Development Fund (ADF)
Period
07/2023 – 12/2023