Projects

Review of Detailed Design of the Railway Line Durres – Tirana Public, Transport Terminal (PTT) and of the new railway connection to Rinas Airport”
Period : 11/2018 – 02/2019

Study-Design “Engineering Measures for the stabilization of the landslide in the Cfaka hill, near the national road Gjirokaster-Kakavije”
Period : 10/2018 – 02/2019

“Study and Design of the group and service roads (wells) of the oil fields at Ballsh-Hekal”
Period : 12/2018 – 05/2019

“The preparation of Detailed Design and Bill of Quantity for the rehabilitation of existing road Uji i Ftohte – Orikum and the construction of two Bypasses”
Period : 01/2018 – 10/2019