Projects

Construction Supervision Services-FIDIC Engineer for Phases I and II for the construction of Beljakovce – Kriva Palanka section, part of Railway Corridor VIII
Period :10/2022-12-12/2022

“Feasibility Study for Reconstruction of Quays 1 & 2 in the Durres Port”
Period :06/2018 – 09/2019

Technical Studies, Detail Design and Environmental and Social Studies Completion for the Waste Management Investment Program “EU For Circular Economy” In Albania, LOT 1 – Kukes
Period : 06/2018 – 09/2019

"Preliminary and detailed design for the internal infrastructure of Touristic Resort Green Coast 3 in Palasa, Vlora"
Period :12/2022 – 12/2023

"Preparation of the Detailed Design of the road that will link Apollonia Archaeological Park with Fieri Bypass motorway"
Period : 05/2015 – 07/2015

"Preparation of the Detailed Design of the road that connects the Archaeological Park of Bylis with the Levan - Tepelene highway”
Period : 01/2023 – 10/2023

Preparation of the Design for the reconstruction of "18 September" Boulevard and its links: Roads "Rexhep Qosja" and "Gole Gushi", Gjirokaster
Period : 05/2015 – 07/2015

"Supervision of Works for the rehabilitation and restoration of the Monastery of St.Mary in Apollonia"
Period : 01/2014 – 02/2016

Gjirokastra - Viroi Park Road, Pedestrian Lane, and Lighting (2.2 km road)"
Period : 01/2014 – 06/2014

Preparation of the Detailed Design and Tender Dossier regarding the Restoration Works in Historical Heritage Sites Elbasan, Berat, Vlora, Burrel, Kruja & Shkodra
Period : 06/2014 – 11/2014