Projects

Analysis of carbon emissions in Tirana International Airport

Period : 09/2022- 12/2022

Study and design of road safety elements for the existing network of bicycle lanes, their improvement, addition and completion

Period : 02/2023- 08/2023

Periodic Measurements of Passengers in City Public Transport

Period : 11/2022- 11/2023

Design Study for the construction of “Zef Serembe” street

Period :10/2023- 02/2024

Design Study for requalification of the residential area between “Mihal Grameno", “Todi Shkurti” and “Zonja Curre” streets

Period : 10/2023- 02/2024

Elimination of Black Spots in the National Road network-2023 (Turnkey contract)

Period :11/2023- 02/2024

Supervision of Construction Works for two bridges along segment ‘Sheshi Shqiponja-Bulevardi I Ri-Shkoze”, part of new Tirana Ring Road

09/2022- 12/2022